Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Royal Palm Beach
A full kitchen remodel in Royal Palm Beach typically runs $14,000-$45,000 and takes 6-10 weeks from HOA architectural review through final inspection. Our crews serve Royal Palm Beach from our South Florida coordination office, and we’ve built our scheduling system around the village’s unique pre-permit approval layer that most contractors stumble over. Call (561) 475-3903 to schedule your free estimate.
We’ve remodeled kitchens in La Mancha, Saratoga Pines, and the Original Heights neighborhoods, and the pattern is consistent: Royal Palm Beach’s 1970s-1990s CBS tract housing stock is hitting the 30-50 year mark all at once, with original cabinets, early CPVC or galvanized plumbing, and electrical panels that predate modern appliance loads. The sameness of these homes means we can predict what we’ll find, but it also means the Village’s permit office and local HOA architectural review boards are processing concentrated waves of renovation applications. We sequence every Royal Palm Beach kitchen remodel approval-first, not demo-first, so your project never sits half-finished waiting on a committee.
Why Rowan Construction Group West Palm Beach Is Royal Palm Beach’s Preferred Kitchen Remodeling Company
We’ve delivered 4,000-plus projects since 2007, every one with a written price before work started and a documented photo record when the crew left. In Royal Palm Beach specifically, that discipline matters more than most places because of the village’s dual-layer approval system. Our customers in Saratoga Pines and the Villages of Royal Palm Beach have left reviews noting that we were the only contractor who explained the HOA review timeline upfront rather than discovering it three weeks into a stalled project.
Our response time to Royal Palm Beach is same-day or next-day for estimates, with scheduling coordinated from our Miami office. Crews arrive background-checked and uniformed, and a live person answers calls 24/7. The photo record we deliver after every visit is standard, not an upgrade, so you have evidence of what was behind your cabinets before anything was removed.
We know the local conditions: western Palm Beach County’s water table sits 18-24 inches below grade, which affects any footing or utility work, and the intense inland storms building off the Everglades accelerate wear on exterior-facing kitchen windows and stucco penetrations. We factor this into material specs and permit applications so inspections pass the first time.
Our Kitchen Remodeling Services in Royal Palm Beach

Full Kitchen Remodeling
A full kitchen remodel in Royal Palm Beach means working within CBS construction where load-bearing walls often sit exactly where homeowners want open concept, and where pre-1992 homes may need impact-glazing or roof-to-wall connection upgrades to satisfy current insurance requirements. We price these contingencies into the original scope rather than hitting you with surprises after demo. Our Kitchen Remodeling team handles structural assessment, plumbing rough-in, electrical panel evaluation, and finish installation as a single coordinated scope with one written price.

Kitchen Design & Layout
Design in Royal Palm Beach starts with the HOA architectural review packet, not the tile sample. Any exterior-visible change - window replacement, door relocation, stucco penetration for a vent hood - requires board approval before the Village will accept a permit application. We prepare the material board, elevation drawings, and color samples as part of our standard design fee, and we file the packet ourselves. The 2-4 week review window is built into every schedule we write. We’ve learned which cabinet profiles, window styles, and exterior colors typically move through Royal Palm Beach HOA boards without revision, and we steer clients toward those options when timeline matters.

Quartz & Granite Countertops
We source Cambria and Caesarstone quartz and granite slabs through our network of fifty-plus vetted brands, with templating and fabrication turnaround timed to the HOA approval date, not the demo date. In Royal Palm Beach’s humidity, we specify full-height backsplashes and proper silicone sealing at slab-to-wall junctions to prevent the mold issues we’ve seen in older CBS homes where original installations cut corners. The quote includes edge profile, cutouts, and installation; no line item gets added later.

Cabinets & Countertops
Our cabinet installations use KraftMaid and Wellborn lines with soft-close hardware and plywood box construction, specified for Florida’s humidity cycling. In Royal Palm Beach’s 1980s ranches, we regularly find original cabinets built in place rather than modular, which means removal exposes wall conditions no one has seen in four decades. We price for this possibility upfront, with a written allowance for substrate repair that converts to a signed change order only if needed. The alternative - a low bid that balloons after demo - violates Clause 1 of the Haven Standard.

Backsplash, Tile & Flooring
Tile work in Royal Palm Beach kitchens requires waterproofing membranes at wet walls, especially in homes where original construction used direct-bond methods that have failed. We specify Schluter or equivalent crack-isolation membranes over CBS slab-on-grade foundations, which shift differently than framed subfloors. Flooring transitions between kitchen and living areas are planned around the final cabinet toe-kick height so the visual line stays clean.

Small & Partial Kitchen Remodels
Not every Royal Palm Beach kitchen needs the full treatment. Partial remodels - cabinet refacing, countertop replacement, or backsplash-only updates - still require HOA review if windows or exterior doors are involved. We evaluate whether your scope triggers review and build the schedule accordingly. A countertop-and-backsplash job without exterior changes can move faster, but we still deliver the same written price, photo record, and 365-Day Done Right Promise.

Kitchen Island Installation
Islands in Royal Palm Beach’s typically compact 1970s-1980s kitchens require careful spatial planning and often electrical or plumbing rough-in through slab-on-grade concrete. We core-drill with dust control and patch to match existing flooring. The island quote includes structural assessment - we’ve found too many “floating” islands installed by others with no anchorage to the slab.

Cabinet Installation & Refacing
Refacing makes sense when the cabinet boxes are sound but the doors and drawer fronts are dated. In Royal Palm Beach, we assess for water damage behind sinks and at dishwasher locations before recommending this route. If the substrate is compromised, we explain why and price full replacement with the same brand lines.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Before
AfterTrusted Brands We Service in Royal Palm Beach
We maintain sourcing relationships with KraftMaid and Wellborn for cabinetry, Cambria and Caesarstone for countertops, and Kohler and Toto for fixtures, among fifty-plus vetted brands. For Royal Palm Beach hardscaping adjacent to kitchen additions or ADU projects, we also specify Belgard, Techo-Bloc, and Tremron pavers. Local inventory availability is confirmed before the HOA packet is filed, so material lead times never extend beyond the approval window. We don’t ask you to choose between a brand you want and a timeline we promised; we confirm both in writing before anyone picks up a tool.
Common Kitchen Remodeling Problems We See in Royal Palm Beach Homes

- HOA approval delays strand projects. Contractors who demo or order cabinets before architectural review sign-off lose 2-4 weeks while the board meets, because the Village permit office rejects applications without that approval. We file the packet first, receive written sign-off, then schedule demo.
- Load-bearing walls hide behind original cabinets. In La Mancha and similar 1970s-1980s CBS ranches, we’ve found headers notched by previous handymen sitting above cabinet runs. We assess structure before pricing open-concept removal, and we rebuild headers with permits and inspection, not shortcuts.
- Galvanized and early CPVC lines weep into subfloors. Original plumbing behind 40-year-old cabinets has reached end of life. We include access-and-replace allowances in our written quotes, with photo documentation of what we find and signed change orders for any additional work.
- Pre-1992 homes trigger insurance-driven upgrades at inspection. Impact-glazing, roof-to-wall connections, and electrical panel upgrades get flagged when permits are pulled on older Royal Palm Beach homes. We price these possibilities into the original scope and adjust with signed change orders if inspection requires them, so the project never stalls waiting on a committee.
Pricing for Kitchen Remodeling in Royal Palm Beach, FL
These are the price ranges we deliver in writing before any work starts on Royal Palm Beach kitchen projects. Every quote is flat-priced with a written scope and warranty; “call for a quote” is not an option here.
| Service | Price Range in Royal Palm Beach |
|---|---|
| Kitchen Remodel | $14,000 - $45,000 |
| Cabinet Installation | $4,000 - $13,000 |
| Countertop Installation | $2,000 - $6,500 |
| Backsplash Installation | $800 - $2,500 |
| Kitchen Island Installation | $3,000 - $10,000 |
What moves a Royal Palm Beach kitchen toward the higher end: structural wall removal requiring engineered beams, plumbing relocation through slab, electrical service upgrades from original panels, and HOA-mandated exterior material upgrades. What keeps costs controlled: maintaining the existing footprint, refacing rather than replacing cabinets, and selecting from our standard brand lines where we have volume pricing. Every quote includes a free second opinion on any competitor’s written estimate - bring it in and we’ll review it line by line at no charge.
Call (561) 475-3903 for your written estimate. Estimates are free, and the price we give is the price you pay, within a few percent, because no change proceeds without a signed change order.
We Also Serve Cities Near Royal Palm Beach

Our crews remodel kitchens throughout western Palm Beach County, including Kitchen Remodeling in Royal Palm Beach proper plus Wellington, Greenacres, Palm Beach Gardens, and West Palm Beach. Each municipality has its own permit and, in some cases, HOA requirements, and we maintain current familiarity with all of them. Wellington’s equestrian estates and West Palm Beach’s historic districts carry different approval layers than Royal Palm Beach’s concentrated CBS subdivisions, and we schedule accordingly.
Serving Royal Palm Beach, FL - Our Local Coverage Area
We’re based in the Royal Palm Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Kitchen Remodeling in Royal Palm Beach

Yes, if your remodel includes any exterior-visible change such as window replacement, door relocation, or stucco penetration for a vent hood. The Village of Royal Palm Beach will not accept a permit application without written HOA architectural review board approval, and that review typically takes 2-4 weeks. We prepare and file the submittal packet - material boards, elevation drawings, color samples - as part of our standard process, and we schedule no demo until written sign-off is in hand. Call (561) 475-3903 and we’ll confirm whether your specific scope triggers review.
A full kitchen remodel in Royal Palm Beach costs $14,000-$45,000, with small or partial remodels starting around $9,000. Cabinet installation runs $4,000-$13,000, countertops $2,000-$6,500, and backsplashes $800-$2,500. Your specific price depends on scope, material selections, and any structural or plumbing surprises behind original 1970s-1990s construction. We deliver the written price before work starts, every time. Call (561) 475-3903 for your exact quote - estimates are free.
Often yes, but many Royal Palm Beach CBS ranches from that era have load-bearing walls exactly where open-concept plans want them gone. We assess structure during our initial site visit and price engineered beam installation if needed, with permits and inspection included. In a La Mancha home, we found a notched header above a cabinet run that a previous handyman had compromised; we rebuilt it properly before installing new KraftMaid cabinets and a Cambria island. Call (561) 475-3903 and we’ll evaluate your specific wall.
Yes. We file the HOA architectural review packet, submit the Village permit application after approval, schedule inspections, and manage sign-offs. This is standard on every Rowan kitchen remodel, not an add-on fee. Under the Haven Standard, the administrative discipline of proper sequencing - approval first, permit second, demo third - is what keeps projects within a few percent of the agreed price instead of bleeding cash during avoidable delays.
Typically 6-10 weeks from HOA filing through final inspection, with 2-4 weeks of that being the architectural review window before a permit number even exists. Demo-through-finish usually runs 4-6 weeks once permitted, assuming no structural surprises. We build the schedule approval-first so your kitchen is never left half-demolished waiting on a board meeting. Call (561) 475-3903 and we’ll map the realistic timeline for your specific scope and HOA.
Ready to price your kitchen remodel? Call (561) 475-3903 to schedule your free estimate. We’ll deliver a written price with a written scope and warranty before anyone picks up a tool, and we’ll handle the HOA and permit paperwork so your project moves forward without the delays that stall other Royal Palm Beach renovations. Under our 365-Day Done Right Promise, if it’s not done right, we make it right - backed by The Haven Standard, not a handshake.
Written by Grant Rowan, Owner at Rowan Construction Group, serving Royal Palm Beach since 2007.







Before
After
Before
After