Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Kitchen Remodeling for West Palm Beach Homeowners
A full kitchen remodeling project in West Palm Beach typically runs $14,000-$45,000, with most homeowners receiving a written flat-price quote within 48 hours of our first visit. Rowan Construction Group has delivered 4,000-plus projects since 2007, every one with a documented photo record and a price signed before any work started. We’re led by Grant Rowan and operate under The Haven Standard, which means Clause 1 applies from the first conversation: the price is written before anyone picks up a tool. Call (561) 475-3903 to schedule your free estimate.
West Palm Beach kitchens take a beating that northern climates don’t replicate. The salt air off the Intracoastal accelerates corrosion on cabinet hinges and faucet finishes. The summer humidity swells particleboard substrates in older cabinets, particularly in homes built before 1990 in neighborhoods like Flamingo Park and Northwood. We’ve opened walls in El Cid and Southland Park to find galvanized plumbing corroded from the inside out, and we’ve replaced subfloors in Grandview Heights where repeated mopping on unsealed tile let moisture creep into the plywood below. These aren’t hypotheticals. They’re what we document on every visit, photograph by photograph, so the homeowner sees what we see before we quote a dollar.
Our crews are background-checked and uniformed. A live person answers calls 24/7. And every kitchen remodeling project in West Palm Beach carries the 365-Day Done Right Promise: if it’s not done right, we make it right, backed by the full terms page, not a handshake.
What Our Kitchen Remodeling Service Includes
Full Kitchen Remodeling
A full kitchen remodeling project strips the room to substrate and rebuilds it: cabinets, countertops, flooring, lighting, plumbing fixtures, and often electrical service upgrades. West Palm Beach homeowners typically pursue this when the kitchen hasn’t been updated in 20-plus years, or when they’ve purchased a fixer in neighborhoods like Mango Promenade or Old Northwood and need the space to function for a modern household. At Rowan Construction Group, we measure every wall for plumb and level before ordering a single cabinet, because Florida’s sandy soils and decades of settling mean walls that look straight rarely are. The written quote includes a line item for substrate correction if we find it, so there’s no surprise when the cabinets arrive.

Cabinets & Countertops
Cabinets and countertops are the visual and functional core of any kitchen, and they’re where most West Palm Beach remodeling budgets concentrate. We source from fifty-plus vetted brands including KraftMaid and Wellborn for cabinets, and Cambria and Caesarstone for countertops, which lets us put honest numbers in the written quote rather than inflated allowances. The particleboard-core cabinets common in 1980s West Palm Beach tract homes, particularly in developments west of I-95, sag and delaminate in our humidity; we specify plywood-box construction with solid-wood face frames for replacement. Countertop installation runs $2,000-$6,500 depending on material and linear footage, with quartz and granite requiring template precision that we verify with digital measurements before fabrication.

Backsplash
A backsplash, tile and flooring project protects the wall behind cooktops and sinks from grease, moisture, and the impact of daily cleaning. In West Palm Beach, we see two common failures: grout cracking behind gas ranges where thermal expansion stresses the joint, and water wicking behind sinks where the caulk seal has failed and the drywall behind it has turned to mush. We remove failed substrate to stud, install cement board with proper weep screed at the counter junction, and set tile with polymer-modified thinset rated for our humidity. Backsplash installation runs $800-$2,500, with subway tile on the lower end and mosaic or natural stone requiring more labor at the higher end.

Tile & Flooring
Kitchen flooring in West Palm Beach must handle humidity, salt air, and the occasional tropical storm tracking water through the back door. We remove existing flooring to evaluate the subfloor’s condition, because vinyl-over-vinyl installations common in 1990s flips often hide plywood that’s begun to delaminate. Porcelain tile, luxury vinyl plank, and engineered hardwood are the three materials we quote most often, with porcelain rated for outdoor use holding up best in homes near the water in Palm Beach or along Flagler Drive. The written quote specifies transition strips, underlayment type, and floor prep so you know what you’re paying for before demolition starts.

Kitchen Design & Layout
Layout changes, the most expensive and consequential part of kitchen remodeling, involve moving walls, relocating plumbing stacks, or reconfiguring the work triangle. West Palm Beach’s older homes, particularly the 1920s Mediterranean Revival properties in El Cid and Flamingo Park, have load-bearing walls that weren’t designed for open-concept living. We bring in a structural engineer when wall removal is proposed, pull the required permits through the City of West Palm Beach Building Division, and coordinate inspections at rough-in and final. The written quote separates structural, mechanical, and finish costs so you can value-engineer if needed, and no layout change proceeds without a signed change order under The Haven Standard.

Small & Partial Kitchen Remodels
Not every West Palm Beach kitchen needs a full gut. Partial remodeling targets specific elements: cabinet refacing with new doors and drawer fronts, countertop replacement while keeping existing cabinets, or flooring-only updates in a kitchen that’s otherwise functional. Small kitchen remodeling runs $9,000-$20,000, making it accessible to homeowners in Greenacres or Palm Springs who want impact without the full investment. We evaluate whether your existing cabinets are structurally sound enough to reface, because refacing failing boxes is a waste we won’t recommend. The photo record from our first visit shows you exactly what we found, so the recommendation is verifiable, not asserted.

Cabinet Installation & Refacing
Cabinet installation and refacing is the most technically demanding finish trade in kitchen remodeling, requiring walls that are plumb, floors that are level, and boxes that are square to each other within a sixteenth of an inch. In West Palm Beach’s older homes, we shim and scribe to compensate for out-of-plumb corners that have settled over decades. Cabinet installation runs $4,000-$13,000 for a typical kitchen, with refacing at the lower end if boxes are sound. We specify soft-close hinges, full-extension drawer glides, and plywood construction in every quote, because these are the details that determine whether cabinets function for fifteen years or fail in five. Refacing is viable only when the existing cabinet boxes are structurally sound, the interior layout meets your needs, and the face frames are hardwood rather than the MDF that swells in our humidity.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Brands We Service for Kitchen Remodeling

We’ve installed hundreds of Kohler sinks and faucets across West Palm Beach, from the farmhouse apron-front sinks popular in Northwood renovations to the touchless faucets homeowners in Admirals Cove specify for busy households. Kohler’s cast-iron enamel holds up to the abrasive cleaners our hard water demands, and we stock common cartridge and seal kits so repairs don’t require a two-week parts wait. Moen is our go-to for cartridge-style faucets and shower valves in kitchen-adjacent mudrooms and pool baths; their 1225 and 1222 cartridges are the most common replacements we perform, and we carry both on every truck. For sinks and accessories, Blanco’s Silgranit composite resists the staining and thermal shock that crack porcelain in Florida’s temperature swings, and we’ve installed their undermount and apron-front models in kitchens from The Acreage to Wellington.
Caesarstone’s quartz surfaces are specified in roughly half our West Palm Beach countertop installations, particularly in the honed and concrete-look finishes that match the coastal-modern aesthetic common in new construction near the water. We template with digital measuring tools, verify slab selection at the distributor with the homeowner present, and inspect every edge profile before the fabricator releases the job. Whether you have Kohler, Moen, Blanco, Caesarstone, or any other make, we can source, install, and stand behind the work with the 365-Day Done Right Promise.
Before
AfterSigns You Need Kitchen Remodeling Right Now
- Water damage under the sink or behind appliances. The particleboard subfloor and cabinet bases common in pre-2000 West Palm Beach kitchens turn to oatmeal when leaked on repeatedly. We pull the sink base, photograph the damage, and show you whether the fix is localized or signals a systemic plumbing failure that justifies full replacement.
- Cabinet doors that won’t close or drawers that jam. Hinge cups strip out of particleboard sides, drawer boxes rack out of square, and glide hardware corrodes in salt air. These are symptoms of cabinet construction that won’t improve with adjustment, and they’re the point where refacing becomes false economy.
- Countertops with burned, cracked, or delaminated surfaces. Laminate countertops from the 1990s peel at seams, and the MDF substrate underneath swells with every spill. Solid-surface and stone countertops that have cracked need substrate evaluation, because the crack usually indicates movement or inadequate support that will destroy the replacement if not addressed.
- Lighting that leaves work surfaces in shadow. The single ceiling fixture common in 1970s West Palm Beach kitchens doesn’t meet modern task-lighting standards. We specify recessed, under-cabinet, and pendant lighting with color temperatures matched to the countertop material, because granite under 2700K reads differently than under 4000K.
- The layout fights you every time you cook. A work triangle stretched beyond 26 feet, a refrigerator door that blocks the entry when open, or a cooktop with no landing space on either side are design failures that remodeling corrects. We measure your actual movement patterns and propose layouts that reduce steps, not just look better in a rendering.
Our Kitchen Remodeling Process - Step by Step

- 1
On-site evaluation and photo documentation. We arrive at your West Palm Beach home with a uniformed, background-checked crew, photograph every surface, and note conditions that affect the quote: wall plumb, floor level, electrical panel capacity, plumbing material and condition. You receive these photos with the written estimate, so the basis for every dollar is visible.
- 2
Written flat-price quote with line-item scope. Under Clause 1 of The Haven Standard, the price is written before any work starts. The quote separates demolition, rough carpentry, plumbing, electrical, HVAC if needed, insulation, drywall, cabinets, countertops, flooring, backsplash, painting, and fixtures. Each line carries a dollar amount and a specification, so you can compare apples-to-apples with any competitor’s quote.
- 3
Permit application and material procurement. We pull permits through the City of West Palm Beach Building Division or the appropriate municipality, and we order materials with confirmed lead times. Cabinet delivery currently runs 6-10 weeks for semi-custom lines, and we don’t schedule demolition until materials are in our warehouse, because living without a kitchen is hardship enough without adding delay.
- 4
Demolition, rough-in, and inspection. The crew removes existing finishes to substrate, addresses structural or mechanical issues discovered, and schedules inspections at rough plumbing, electrical, and framing stages. Every visit generates a new photo record, uploaded to your project folder the same day.
- 5
Finish installation, final inspection, and walkthrough. Cabinets are shimmed, leveled, and secured; countertops are templated, fabricated, and installed; flooring, backsplash, painting, and fixtures complete the sequence. We conduct a punch-list walkthrough with you, document completion with final photos, and activate the 365-Day Done Right Promise in writing.
How Much Does Kitchen Remodeling Cost in West Palm Beach?
A typical kitchen remodel in West Palm Beach runs $14,000-$45,000 depending on size, layout changes, and material selection. Small kitchen remodeling, common in condos along Flagler Drive and bungalows in Northwood, ranges $9,000-$20,000. Cabinet installation alone is $4,000-$13,000; countertop installation adds $2,000-$6,500; backsplash installation runs $800-$2,500; and kitchen island installation, which requires electrical and often plumbing rough-in, ranges $3,000-$10,000.
| Service | Price Range in West Palm Beach |
|---|---|
| Full Kitchen Remodel | $14,000 - $45,000 |
| Small Kitchen Remodel | $9,000 - $20,000 |
| Cabinet Installation | $4,000 - $13,000 |
| Countertop Installation | $2,000 - $6,500 |
| Backsplash Installation | $800 - $2,500 |
| Kitchen Island Installation | $3,000 - $10,000 |
Several factors push projects toward the higher end of these ranges. Layout changes requiring structural wall removal add engineering and permit costs. Electrical service upgrades from 100-amp to 200-amp panels, common in pre-1980 homes throughout West Palm Beach, run $2,500-$5,000 additional. Custom or inset cabinetry costs 40-60% more than semi-custom frameless construction. And natural stone countertops like marble or quartzite require more fabrication labor than engineered quartz.
To avoid overpaying, we recommend comparing written quotes line by line, not just bottom-line totals. A competitor’s lower number may exclude permit fees, exclude countertop fabrication, or specify builder-grade cabinets while quoting a premium price. Our Free Second Opinion on Any Written Estimate exists for exactly this situation: bring us a competitor’s quote and we’ll review it item by item at no charge, flagging what’s missing or mis-specified.
Every free estimate from Rowan Construction Group includes the site visit, photo documentation, written flat-price quote with line-item scope, and a terms sheet explaining the 365-Day Done Right Promise. There is no obligation to proceed, and no deposit is required to receive the quote. Call (561) 475-3903 to schedule yours.
Kitchen Remodeling Near West Palm Beach - Our Service Area

Rowan Construction Group performs kitchen remodeling throughout Palm Beach County and into northern Broward, with concentrated work in Kitchen Remodeling in West Palm Beach, Kitchen Remodeling in Westgate, and Kitchen Remodeling in Riviera Beach. We also regularly serve Lake Park, North Palm Beach, Royal Palm Beach, Palm Beach, Palm Beach Gardens, Palm Springs, Greenacres, The Acreage, and Wellington. Most West Palm Beach homeowners receive an appointment within two business days, and written quotes follow within 48 hours of our visit. Crews dispatched from our central location reach Royal Palm Beach or Palm Beach Gardens within 30 minutes during normal traffic, and we schedule Riviera Beach and Lake Park jobs on the same days to minimize travel overhead that would otherwise inflate your quote.
Serving West Palm Beach, FL - Our Local Coverage Area
We’re based in the West Palm Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
Frequently Asked Questions - Kitchen Remodeling in West Palm Beach

Kitchen remodeling is the renovation of a kitchen’s structure, systems, and finishes, typically involving cabinet replacement or refacing, countertop installation, flooring, lighting, plumbing fixtures, and sometimes layout changes or electrical upgrades. In West Palm Beach, it often includes addressing humidity-related substrate damage and updating kitchens in homes built before modern energy codes. Rowan Construction Group delivers every kitchen remodel with a written flat-price quote, documented photo record, and the 365-Day Done Right Promise. Call (561) 475-3903 for a free estimate.
A full kitchen remodel typically takes 6-10 weeks from demolition to final walkthrough, with cabinet lead times currently the longest variable at 6-10 weeks for semi-custom lines. Small kitchen remodels or partial updates finish in 2-4 weeks. We don’t schedule demolition until materials are in hand, because The Haven Standard’s Clause 1 discipline extends to scheduling: we commit to timelines we can keep. Call (561) 475-3903 to discuss your project’s specific schedule.
Full kitchen remodeling in West Palm Beach costs $14,000-$45,000, small kitchen remodeling runs $9,000-$20,000, and individual components like cabinet installation ($4,000-$13,000), countertop installation ($2,000-$6,500), and backsplash installation ($800-$2,500) can be priced separately. The final number depends on size, layout changes, material grades, and mechanical system condition. Every quote from Rowan Construction Group is a flat written price with line-item scope, delivered before any work starts. Call (561) 475-3903 for an exact quote - estimates are free.
Yes, we install and service Kohler, Moen, Blanco, and Caesarstone products regularly, and we source from fifty-plus vetted brands total. Our crews carry common repair parts for Kohler and Moen faucets, and we template Caesarstone countertops with digital measuring tools verified at the fabricator. If your kitchen includes these brands or any other make, we can specify, source, install, and warranty the work. Call (561) 475-3903 to discuss your material preferences.
We don’t classify kitchen remodeling as an emergency service, because it’s planned construction, not a sudden failure like a roof leak or burst pipe. However, we do respond quickly to kitchen situations that create safety hazards: gas leaks from ranges, electrical arcing from damaged outlets, or water damage that threatens structural integrity. A live person answers calls 24/7, and we’ll dispatch to evaluate and stabilize, then schedule the full remodel. For planned kitchen remodeling, call (561) 475-3903 to schedule your free estimate.
Every kitchen remodeling project carries the 365-Day Done Right Promise: if it’s not done right, we make it right, with the full terms printed on your contract, not an asterisk. This covers workmanship, installation quality, and material defects we can control. Manufacturer warranties on cabinets, countertops, and fixtures run separately and vary by brand; we register these on your behalf and provide documentation. The Haven Standard requires this warranty in writing because a handshake isn’t evidence. Call (561) 475-3903 for full terms.
Clear all cabinets and drawers, relocate or cover furniture in adjacent rooms, and establish a temporary kitchen elsewhere in the home with a microwave, coffee maker, and refrigerator if possible. We’ll provide a detailed preparation checklist after you approve the quote, including utility shutoff timing and dust containment measures. For West Palm Beach homes with original windows, we recommend removing and storing any window treatments you want preserved, because demolition vibration can damage old hardware. Call (561) 475-3903 to schedule your free estimate and receive the full preparation guide.
Schedule Your Kitchen Remodeling Service in West Palm Beach Today
Call (561) 475-3903 to schedule your free kitchen remodeling estimate in West Palm Beach. You’ll receive a site visit with documented photos, a written flat-price quote with line-item scope, and the 365-Day Done Right Promise backed by The Haven Standard. No deposit is required for the quote, and our Free Second Opinion on Any Written Estimate means you can compare with confidence. A live person answers calls 24/7, and Grant Rowan stands behind every project.
Written by Grant Rowan, Owner at Rowan Construction Group, serving West Palm Beach since 2007.







Before
After
Before
After