Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Oldcastle Bathroom Remodeling: The West Palm Beach Owner’s Guide
Oldcastle bathroom remodeling in West Palm Beach typically runs $9,000-$28,000 for a full replacement, with most projects quoted within 24 hours and started within two weeks of signed agreement. We stock and install Oldcastle-compatible shower enclosures, vanity systems, and waterproofing components, sourced through our network of fifty-plus vetted material brands. Most West Palm Beach homeowners first notice trouble when grout lines crack after summer humidity cycles, or when the shower pan membrane fails and water stains appear on the ceiling below.
Which Oldcastle Models This Applies To
Oldcastle manufactured bathroom products under several series names between the late 1990s and roughly 2018, when they shifted focus to their core building materials division. The most common lines we encounter in West Palm Beach homes are the Oldcastle Bath Solutions framed shower enclosures (model prefix OBS-2000 through OBS-4500), the solid-surface vanity tops sold through regional distributors in the mid-2000s, and the waterproofing membrane systems branded for commercial-to-residential conversion.
To identify your exact model, check the aluminum frame extrusion for a stamped code near the bottom hinge, or the vanity underside for a paper label with a lot number starting with OC or OBS. The shower enclosures used a proprietary 5/16-inch glass thickness in the OBS-3000 series, while the OBS-4000 upgraded to 3/8-inch - a critical difference when ordering replacement hardware, as the hinge bore spacing changed by 3/4 inch. We source OEM-tracked hardware where available, but for discontinued lines we spec equivalent-grade components from our KraftMaid and Kohler supply channels, documented in your written quote so you know exactly what arrives.
Rowan Construction Group West Palm Beach is an independent service provider with no affiliation to Oldcastle Corporation.
Signs Your Oldcastle Bathroom Remodeling Is Failing

- Grout cracking along shower corners or floor joints. In West Palm Beach, the daily humidity swing from 90% morning air to 72°F conditioned interiors stresses cementitious grout. Oldcastle’s original spec called for sanded grout without polymer additive, which we’ve found crumbles faster here than in drier climates. The underlying cause is usually movement at the pan-to-wall joint as the house settles on Florida’s sandy substrate.
- Soft drywall or bubbling paint on the ceiling beneath the bathroom. This indicates the shower pan membrane has breached. Oldcastle’s bonded membrane systems from the 2000s used a PVC composite that degrades with repeated chlorine exposure; we see this most often in second bathrooms where teenage swimmers rinse off.
- Vanity top staining or surface crazing (fine spiderweb cracks). The solid-surface material Oldcastle sourced was an acrylic-modified polyester that yellows under UV if the bathroom window faces west, as many do in Flamingo Park and El Cid neighborhoods. Crazing happens when thermal expansion exceeds the material’s flexibility.
- Door sweep dragging or frame misalignment. The OBS-series enclosures used a nylon-bottom sweep with a 5-year typical lifespan in hard water; West Palm Beach’s municipal water runs 120-180 ppm calcium, which crystallizes in the sweep channel and jams the door.
- Musty odor persistent after cleaning. This points to water trapped behind the tile or surround, often from failed caulk at the fixture penetrations. Oldcastle’s original silicone spec was neutral-cure, which bonds poorly to the porcelain-coated steel tubs common in 2004-2012 construction.
Before
AfterReplacement Cost & What’s Included
Full Oldcastle bathroom remodeling in West Palm Beach runs $9,000-$28,000, with small bathroom projects starting at $5,000-$12,000. The table below breaks out what drives that range.
| Component | Price Range | What Affects It |
|---|---|---|
| Full bathroom remodel | $9,000-$28,000 | Layout changes, plumbing relocation, tile grade |
| Walk-in shower installation | $4,500-$12,000 | Curbless drain system, glass thickness, wall prep |
| Tub-to-shower conversion | $3,500-$10,000 | Existing tub material, drain location change |
| Shower replacement only | $3,000-$8,500 | Pan type, wall surround vs. tile, fixture grade |
| Bathroom vanity installation | $800-$3,000 | Custom vs. stock, countertop material, plumbing |
Every quote from Rowan Construction Group West Palm Beach is a flat written price with line-item scope, delivered before any work starts - Clause 1 of The Haven Standard. The price includes demolition to studs where needed, new waterproofing membrane (we use liquid-applied systems with fabric reinforcement, not sheet goods), installation, and finishing. Our 365-Day Done Right Promise covers the workmanship; manufacturer warranties on materials like Kohler fixtures or Cambria tops transfer directly to you. No change proceeds without a signed change order, which is why our projects finish within a few percent of the agreed number.
DIY or Call Us?

There’s honest work a homeowner can do before calling. Check the shower door sweep for calcium buildup - soak it in white vinegar and see if the door moves freely. Verify whether the musty smell correlates with shower use versus general humidity; a dehumidifier test for 48 hours will tell you. Measure your glass thickness with a caliper if you’re ordering replacement hardware yourself.
Where DIY goes wrong is anything involving the waterproofing layer. Removing tile to access a failed membrane means disturbing the vapor barrier, and reapplying liquid membrane requires a 72-hour cure window with controlled humidity - nearly impossible in an active West Palm Beach household in July. We’ve been called to three jobs this year where the homeowner’s membrane application looked correct but failed the flood test because the substrate moisture content was too high at application. The rework cost more than our original quote would have.
Call (561) 475-3903 to schedule your free estimate. We’ll bring a moisture meter and a photo record of what we find.
FAQs
A properly executed bathroom remodel with modern waterproofing should last 20-25 years in South Florida’s climate, though fixtures and caulk need refresh at 7-10 years. The key variable is the initial membrane installation; we’ve opened walls where the original Oldcastle-era work failed at 8 years because the pan liner was punctured during tile backer installation. Call (561) 475-3903 and we’ll assess your current system with a moisture probe - estimates are free.
Partial repair is viable if the damage is localized - a cracked pan can be patched with a compatible epoxy compound if the subfloor is dry, and door hardware is straightforward to swap. We do not recommend repair when the membrane has failed behind wall tile, because you cannot verify the full extent without removal. Our documented photo record shows you exactly what we find before you decide. Call (561) 475-3903 for a line-item quote on repair versus replacement.
Most projects run 10-14 working days from demolition to final fixture hookup, assuming no plumbing relocation. Layout changes - moving a toilet or converting a tub to a curbless shower - add 3-5 days for permit revision and inspection scheduling. We pull permits as standard and include the inspection timeline in your written schedule. Call (561) 475-3903 to review your specific layout.
We stock common shower door hardware, membrane repair kits, and universal-fit sweeps compatible with Oldcastle dimensions. Discontinued OBS-series glass or proprietary frame extrusions must be ordered, typically 5-7 business days. For full remodels, we source through our regular channels - Kohler, Toto, KraftMaid - with delivery coordinated to your job start date. Call (561) 475-3903 to confirm availability for your specific model number.
Grant Rowan likes to say, “Measure twice, document everything, then get out of the way and let the work speak.” That’s how we’ve delivered 4,000-plus projects since 2007 with a written price before any work started and a binder of documentation at closeout. In West Palm Beach, from the historic homes along Flagler Drive to the newer construction west of I-95, we’ve found that careful documentation upfront prevents the surprises that derail budgets.
Written by Grant Rowan, Owner, Rowan Construction Group West Palm Beach at Rowan Construction Group West Palm Beach, serving West Palm Beach and nearby areas.







Before
After
Before
After