A Rowan company - serving West Palm Beach, FL
Rowan Construction Group West Palm Beach construction team

Shower Replacement Cost - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Shower Replacement Cost in West Palm Beach?

Shower replacement in West Palm Beach typically costs between $3,000 and $8,500, with most homeowners landing somewhere in the $4,500-$6,000 range for a standard full-size shower swap. The final number depends on your current shower’s condition, the materials you choose, and whether the existing substrate – the waterproofing layer and backer board behind your tile – needs to come out before the new installation can start.

Shower Replacement Cost Breakdown (2026)

Here’s how the cost typically breaks down for a shower replacement in West Palm Beach. These figures reflect actual labor and material costs in the South Florida market as of 2026 – not national averages adjusted with a multiplier.

Component Typical Cost Range Notes
Demo and removal $300-$700 Includes disposal; old tile, pan, and backer board
Waterproofing membrane $400-$900 Schluter Kerdi or similar; critical in West Palm Beach’s humidity
Shower pan / base $350-$1,200 Acrylic or solid-surface vs. tiled mud-bed pan
Tile materials $500-$2,500 Porcelain, ceramic, or large-format tile; price varies widely by selection
Tile installation labor $600-$1,800 Per-square-foot rate; larger tiles and patterns add cost
Shower door or enclosure $500-$1,800 Frameless glass runs higher; Kohler and similar mid-range options available
Fixtures (valve, showerhead, trim) $200-$900 Kohler, Moen, or Delta; Toto available for higher-spec builds
Plumbing rough-in adjustments $250-$1,000 Only if supply or drain lines need to move
Permits (Palm Beach County) $150-$400 Required when structural or plumbing work is involved
Total Estimated Range $3,000-$8,500 West Palm Beach market, 2026

A prefabricated acrylic unit with basic fixtures in a master bath that doesn’t need plumbing relocation typically comes in at the lower end – around $3,000-$4,500. A fully tiled walk-in replacement with a frameless glass door, large-format porcelain, a Schluter waterproofing system, and a Kohler pressure-balance valve with a hand shower will push toward $7,000-$8,500. The jump between those two isn’t surprising when you break it out by component: tile and labor alone can account for $2,000-$4,000 of that difference.

For comparison, a full Shower Replacement in West Palm Beach project handled by Rowan Construction Group follows the same written-price process we apply across every trade – the number is on paper before anyone picks up a demo hammer. That matters in a city where material costs have run inconsistently since 2022, because your written quote locks the scope.

What Affects Shower Replacement Pricing in West Palm Beach

Two contractors installing wooden upper kitchen cabinets on a construction site
What Affects Shower Replacement Pricing in West Palm Beach
  • Substrate condition behind the old tile. West Palm Beach’s year-round humidity and occasional flooding from tropical weather events – particularly in lower-elevation neighborhoods like Riviera Beach and the Lake Worth corridor – means we find compromised backer board or deteriorated mortar beds in a significant share of older showers. When the substrate has to come out and be rebuilt, that adds $400-$900 in materials and two to four additional labor hours. We document the condition with photos before pricing any substrate work, so you see exactly what we found.
  • Shower size and layout. A standard 36-by-36-inch shower stall takes fewer materials and less tile-setting time than a 48-by-36-inch or larger walk-in. Custom-shaped or corner showers also require more precise cuts and additional waterproofing at seams, which adds to both labor and material cost.
  • Tile selection. The delta between basic 12-by-12-inch ceramic tile and a 24-by-48-inch rectified porcelain slab is real – sometimes $8-$22 per square foot just in material cost. Larger-format tiles are also heavier, require a flatter substrate, and take more skill to set plumb on a vertical wall. We source tile across more than fifty vetted suppliers, which gives us honest pricing rather than inflated numbers built around a single distributor relationship.
  • Plumbing relocation. Moving a drain or shifting supply lines in West Palm Beach slab construction is more involved than in a crawl-space home – core drilling concrete, rerouting lines, and patching are all part of it. If the existing drain aligns with the new pan, this cost disappears entirely. If it doesn’t, budget $400-$1,000 more.
  • Permit requirements under Palm Beach County code. A like-for-like shower replacement with no plumbing or structural changes may not require a permit. But any project that moves plumbing, alters a load-bearing wall, or changes the footprint does – and skipping it creates a real problem at resale. We handle permit pulls and inspections as part of the written scope, not an add-on billed after the fact.
  • Glass enclosure type. A curtain rod and liner costs almost nothing. A semi-frameless sliding door runs $500-$900 installed. A fully frameless hinged glass enclosure from a manufacturer like Kohler or a custom glazier runs $1,200-$1,800 or more, and requires that the surrounding tile installation is perfectly plumb – which is a good reason to have the same contractor do both.
BeforeBefore
AfterAfter

How to Save on Shower Replacement in West Palm Beach

The single most reliable way to keep shower replacement costs from climbing is to get the full written scope before any work starts. That sounds basic, but it’s the most common place homeowners lose money: a low opening bid that doesn’t account for substrate repair, permit fees, or fixture trim kits will always look cheaper on paper than a complete written quote – until the project is underway and the change orders start arriving. Under Clause 1 of the Haven Standard, Rowan delivers a flat written price with a full written scope before any crew arrives.

Keep the footprint

Relocating a drain or supply line in slab construction is the most avoidable cost in any shower replacement. If you’re happy with the shower’s current position and size, a same-footprint replacement eliminates plumbing relocation costs entirely. That $400-$1,000 savings is real and painless.

Choose tile efficiently

Mid-range 12-by-24-inch porcelain from a domestic supplier hits a sweet spot between appearance and cost. Going to a 24-by-48-inch large-format slab increases both material price and labor time. If you want a large-format look without the full cost, consider using it on two feature walls and a smaller tile on the floor – the visual read is similar, and the material savings are meaningful.

Bundle with adjacent bathroom work

If the vanity, flooring, or toilet are also on a near-term list, doing those simultaneously typically costs less than three separate mobilizations. A home that needs a vanity replacement alongside a shower swap can combine those into a single written scope – one crew, one cleanup, one coordination window.

Use a prefab pan where it fits

A solid-surface or acrylic shower pan – properly set and waterproofed – is a legitimate and durable choice for a standard rectangular shower. It costs less than a custom mud-bed tiled floor and installs faster. The savings range from $300-$600 compared to a custom tiled pan, with no real performance trade-off for a standard shower use case.

Get a free second opinion on any existing estimate

If you already have a competitor’s written quote, Rowan will review it line by line at no charge. That review sometimes surfaces scope gaps – missing waterproofing, unlisted permit costs, vague fixture allowances – that would otherwise turn a low bid into a high final invoice. Call (561) 475-3903 to schedule that review; it doesn’t commit you to anything.

What the Process Looks Like: From Quote to Finished Shower

Professional contractor installing a marble kitchen countertop during a renovation
What the Process Looks Like: From Quote to Finished Shower

Grant Rowan and the Rowan Construction Group team have delivered more than 4,000 residential projects since 2007, every one with a written price before work started and a documented photo record when the crew finished. Here’s what that looks like specifically for a shower replacement in West Palm Beach.

Step 1: On-site assessment and written quote

A background-checked, uniformed estimator visits the site, documents the existing shower with photos, and notes substrate condition, plumbing alignment, and any access constraints. The quote that comes back is a flat price with a written scope – not an hourly estimate with a footnote. If there’s any question about substrate condition that can only be confirmed after demo begins, we write that as a conditional line item with a specific cost range, not a vague “if needed” clause.

Step 2: Material selection

We source fixtures through vetted brands across more than fifty manufacturers – Kohler and Toto for plumbing fixtures, Schluter for waterproofing systems, and tile through a network of suppliers that covers everything from domestic ceramic to imported large-format porcelain. The price in the written quote reflects the materials you actually select, so there’s no allowance guessing later.

Step 3: Demo and substrate preparation

Existing tile, pan, and backer board are removed and disposed of. The substrate condition is re-documented with photos at this stage – this is the point where the conditional line items are either triggered or closed out, with a signed change order required before any additional scope begins. No work proceeds on a change until the change order is signed.

Step 4: Waterproofing

This is the step that determines whether a shower lasts eight years or twenty-five. In West Palm Beach’s climate, where humidity stays elevated most of the year and seasonal rain drives moisture into any gap, we use a sheet membrane system – Schluter Kerdi is our standard specification – applied over cement board backer. Seams at corners and curbs get additional coverage. This is not the place to cut material costs.

Step 5: Tile installation, fixtures, and enclosure

Tile is set in sequence – floor pan first if tiled, then walls – with full coverage thinset on large-format pieces to prevent hollow spots that can crack over time. Fixtures are installed to manufacturer torque specs, and the enclosure is set and adjusted for plumb. Final photos are taken and delivered as part of the standard documented photo record – not an upgrade.

Step 6: Inspection and 365-Day Done Right Promise

If a permit was pulled, the inspection is scheduled and passed before the project closes. The 365-Day Done Right Promise covers the installation: if it’s not done right, Rowan makes it right. That promise is backed by the Haven Standard, not a handshake – the terms are written down and available on request.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

Shower Replacement vs. Related Projects: How the Costs Compare

Shower replacement sits at the mid-range of bathroom renovation costs in West Palm Beach. Here’s how it compares to related projects we handle, so you can make decisions with real numbers in hand.

  • Shower replacement: $3,000-$8,500 – what this page covers
  • Walk-in shower installation (new construction within existing bathroom): $4,500-$12,000
  • Tub-to-shower conversion: $3,500-$10,000 – typically involves drain relocation and more demo
  • Small bathroom remodel (shower, vanity, flooring, toilet): $5,000-$12,000
  • Full bathroom remodel: $9,000-$28,000 – includes layout changes and full finish replacement
  • Bathroom vanity installation: $800-$3,000 – often bundled with shower replacement

If you’re on the fence between a shower-only replacement and a broader bathroom refresh, it’s worth knowing that combining those scopes in one project usually costs meaningfully less than doing them in two separate mobilizations. The savings come from shared demo, shared cleanup, and a single permit pull when one is required.

Why West Palm Beach Showers Need Specific Attention

Professional contractor installing a quartz countertop during kitchen remodeling
Why West Palm Beach Showers Need Specific Attention

South Florida’s climate creates conditions that don’t show up in national shower replacement guides. West Palm Beach averages around 62 inches of rain per year, and the combination of heat and humidity means that any moisture infiltration behind a shower wall stays warm and damp – exactly the environment where mold takes hold and substrate degrades. Older homes in neighborhoods like El Cid, Northwood, and Flamingo Park were often built with materials that weren’t designed for this level of sustained humidity, and we regularly find compromised mortar beds and deteriorated backer board in showers that look fine on the surface.

This is why we document the substrate condition with photos before pricing any substrate repair. You’re not taking our word for it – you’re looking at the same evidence we’re looking at, and the price reflects what the photos show.

Concrete slab construction, common throughout West Palm Beach and Palm Beach County, also means that any drain relocation is a more significant undertaking than in a frame-floor home. We core through the slab, reroute under it, and patch – which adds cost and time. Knowing whether your drain will align with your new pan before you commit to a design saves that expense entirely.

FAQs – Shower Replacement Cost in West Palm Beach

How much does shower replacement cost in West Palm Beach in 2026?

Shower replacement in West Palm Beach costs $3,000-$8,500 for most residential projects. The lower end covers a prefabricated unit with basic fixtures in a shower that doesn’t need plumbing relocation or substrate rebuilding. The upper end reflects a fully tiled installation with large-format porcelain, a frameless glass enclosure, and Kohler-grade fixtures. Call (561) 475-3903 for a free written estimate specific to your bathroom’s conditions.

How long does shower replacement take in West Palm Beach?

Most shower replacements take three to five business days from demo to final inspection, assuming materials are on hand and no substrate surprises require additional ordering. A straightforward prefab unit with no tile can be done in one to two days. A fully tiled installation with a custom mud-bed pan can stretch to five to seven days. We build the project timeline into the written scope so you know the schedule before work starts, not after.

Do I need a permit for shower replacement in West Palm Beach?

A like-for-like replacement within the same footprint, with no plumbing or structural changes, often does not require a permit in Palm Beach County. Any project that moves the drain, relocates supply lines, alters a wall, or changes the shower’s footprint does require a permit – and we pull it as part of the written scope. Skipping a required permit creates a disclosure problem at resale and can void a homeowner’s insurance claim on water damage. We handle the permit process; you don’t have to manage it yourself.

Is it cheaper to repair a shower or replace it entirely?

Repair is cheaper only if the damage is genuinely surface-level: a single cracked tile, a failed grout joint, a leaking valve. If water has reached the backer board or the pan liner has failed, repair typically means removing enough material to expose and fix the problem – at which point the labor cost of a full replacement is often comparable, and the result is better. Shower repairs in West Palm Beach run $400-$1,500 for genuine surface issues. If an estimator visits and the substrate is compromised, the honest recommendation is replacement. We document what we find with photos so the decision is yours, based on evidence.

What’s included in Rowan’s shower replacement quote?

The written quote includes demo and disposal, waterproofing membrane, backer board installation, shower pan or base, tile materials and installation labor, fixture installation, shower door or enclosure, permit fees when required, and cleanup. It’s a flat price with a written scope. If demo reveals a substrate condition that requires additional work, that triggers a written change order with a specific cost before any additional work proceeds – not a verbal heads-up and a surprise line item on the final invoice. Call (561) 475-3903 to schedule an estimate.

Can I update just the tile and leave the shower pan in place?

Sometimes, but it depends on the pan’s condition and material. A fiberglass or acrylic pan that’s structurally sound, well-sealed, and not discolored can often stay in place while wall tile is replaced. A tiled pan with grout failure or a cracked liner needs to come out – and if the liner has been leaking, the substrate under it likely needs attention too. We assess the pan as part of the pre-quote site visit and give you a clear answer before any pricing decision.


Get a Written Shower Replacement Estimate in West Palm Beach

Contractors installing a bathroom vanity and mirror during a home renovation.
Get a Written Shower Replacement Estimate in West Palm Beach

Rowan Construction Group has delivered written-price bathroom projects across West Palm Beach since 2007 – more than 4,000 projects, every one with a signed scope before anyone started work and a documented photo record when they finished. If you’re planning a shower replacement and want a flat price in writing, call (561) 475-3903. Estimates are free, the quote is written, and there’s no pressure to decide on the spot. If you have a competitor’s estimate already, bring it – we’ll review it line by line at no charge, and you’ll leave knowing exactly what each proposal covers.

Written by Grant Rowan, Owner at Rowan Construction Group West Palm Beach, serving West Palm Beach since 2007. Pricing reflects the West Palm Beach market as of 2026. Rowan Construction Group West Palm Beach offers free estimates – call (561) 475-3903.

What Our Customers Say

★★★★★ 4.8 from 6+ reviews

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

"Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."

- Malcolm T.
Need Construction help in West Palm Beach? Licensed & insured · Free in-home estimates response · free estimates
Call (561) 475-3903

Request a Free Estimate

Tell us what's going on in West Palm Beach - we'll get back to you fast. No obligation.

By sending this request, you agree to our Privacy Policy and agree that you may be contacted by phone, email, or text about your request, including by the independent contractors we may refer it to.

Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch