Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
How Much Does Tub-to-Shower Conversion Cost in West Palm Beach?
A tub-to-shower conversion in West Palm Beach, FL typically costs between $3,500 and $10,000, with most homeowners landing somewhere in the $5,000-$7,500 range depending on the size of the alcove, the tile and fixture selections, and whether the existing plumbing needs rerouting. That price includes demo, waterproofing, tile work, a new shower enclosure, and fixtures. If you’re budgeting a broader Tub-to-Shower Conversion in West Palm Beach, Rowan Construction Group delivers a flat written price before any work starts – no “call for a quote” ambiguity.
Tub-to-Shower Conversion Cost Breakdown (2026)
The table below reflects actual West Palm Beach market pricing as of 2026. These are the numbers Rowan uses to build written quotes – not ballpark estimates padded for cushion.
| Line Item | Low End | High End | Notes |
|---|---|---|---|
| Demo and tub removal | $350 | $700 | Cast-iron tubs add labor; fiberglass pulls faster |
| Substrate repair / backer board | $250 | $850 | West Palm Beach’s humidity means we check every layer |
| Waterproofing membrane | $300 | $700 | Schluter Kerdi or RedGard applied to full wet zone |
| Tile – walls and floor | $800 | $3,000 | Porcelain and ceramic sit at the low end; large-format natural stone at the high end |
| Shower pan / base | $400 | $1,200 | Acrylic base is fastest; custom-tiled mud-set pan costs more |
| Plumbing (valve, diverter, drain) | $450 | $1,500 | Simple valve swap is minimal; rerouting supply lines adds cost |
| Shower enclosure or door | $400 | $1,800 | Frameless glass panels cost more but hold up better in South Florida’s hard water |
| Fixtures (showerhead, valve trim, grab bars) | $200 | $900 | Kohler and Delta mid-range lines hit $350-$600 installed |
| Permits (Palm Beach County) | $150 | $400 | Required for plumbing work; Rowan pulls and manages all permits |
| Total | $3,500 | $10,000 | Most West Palm Beach projects settle between $5,000-$7,500 |
The widest swing in that table is tile, and it’s worth understanding why. In the West Palm Beach market, a standard 12×24 porcelain tile installed on a 36″x36″ alcove shower might cost $900-$1,200 total for material and labor. Swap that for 24×48 book-matched porcelain slabs on a 36″x60″ walk-in conversion, and you’re looking at $2,500-$3,000 just for the wall tile. The size of the original tub footprint matters too – a 60″ alcove tub converts more cleanly than an irregularly sized soaker, which often requires framing adjustments that add half a day of labor at West Palm Beach trade rates.
Plumbing is the other variable that can quietly move a quote. If the existing shutoffs are in good shape and the drain can be relocated a few inches without opening the floor, it stays at the low end. In older homes east of I-95 – neighborhoods like El Cid, Flamingo Park, and Prospect Park – galvanized supply lines or ABS drain stacks sometimes need partial replacement, which is a legitimate added cost that a written scope identifies before anyone starts cutting tile.
What Affects Tub-to-Shower Conversion Pricing in West Palm Beach

- Existing substrate condition: West Palm Beach’s year-round humidity and occasional tropical moisture intrusion make substrate inspection non-negotiable. A tub surround that looks intact from the outside can have delaminated cement board or soft drywall behind it. Rowan’s crew documents the substrate condition with photos before waterproofing begins – if the framing behind a master bath in SoSo or Northwood needs sistering, that shows up in a signed change order, not a surprise invoice.
- Conversion footprint size: A straightforward alcove-to-shower swap that uses the same 30″x60″ footprint is the least disruptive and least expensive path. Expanding into an adjacent closet or removing a wall to create a walk-in format – something we see frequently in West Palm Beach homes built in the 1970s and 1980s – adds framing, drywall, and sometimes electrical work that can push the project toward the $8,000-$10,000 range.
- Tile selection and layout complexity: Material costs for tile vary from roughly $2 per square foot for ceramic to $18+ for natural stone or high-end porcelain. Pattern complexity matters too – a stacked horizontal layout is straightforward; a herringbone or offset large-format layout takes more cuts and more labor time. In the West Palm Beach market, tile labor runs approximately $8-$14 per square foot installed depending on format and pattern.
- Plumbing scope: A same-location drain and a simple valve upgrade keeps plumbing costs minimal. Moving the drain more than a few inches – or converting from a tub/shower combo valve to a dedicated shower system with a thermostatic valve – can add $400-$900 to the plumbing line. Palm Beach County requires a licensed plumber for drain work, which Rowan coordinates as part of the project, not as a separate contract you have to manage.
- Enclosure and door selection: A basic chrome-framed sliding door on an acrylic base is the fastest and least expensive finish. Frameless glass panels – particularly popular in West Palm Beach’s coastal-aesthetic renovation market – cost more upfront but have fewer places for hard-water deposits and mildew to accumulate, which matters in this climate. Expect $800-$1,800 for frameless versus $350-$600 for a framed unit.
- Accessibility features: Grab bars, a fold-down teak bench, a handheld Kohler showerhead, and a curbless (zero-threshold) entry are increasingly common requests in West Palm Beach, particularly for aging-in-place renovations in neighborhoods like Palm Beach Lakes and Riviera Beach adjacent communities. These features add $300-$900 to the overall cost but often reduce long-term liability and increase resale appeal in a market where buyers skew older.
- Permit and inspection requirements: Any project that touches plumbing in Palm Beach County requires a permit and a rough-in inspection before the walls close. Rowan handles permit applications and schedules inspections as a standard part of the project – the permit fee ($150-$400 depending on scope) is included in the written quote, not added after the fact.
Before
AfterWest Palm Beach Market Context: Why These Numbers Are What They Are
Labor costs in West Palm Beach run higher than Florida’s inland markets. Tile setters and licensed plumbers working in Palm Beach County carry current workers’ comp and liability coverage, which is reflected in their rates. A conversion quoted at $2,800 by an unlicensed crew skips the permit, skips the membrane inspection, and leaves the homeowner holding a code violation if they sell or file an insurance claim. That’s not a discount – it’s a deferred cost.
Material costs are also specific to this market. The South Florida distribution network for tile, fixtures, and waterproofing products is strong – brands like Schluter, Laticrete, Kohler, and Delta are readily available through regional suppliers, which keeps lead times short and pricing competitive. Where costs climb is in specialty orders: large-format Italian porcelain or custom shower systems from brands like Hansgrohe or Brizo can add 2-3 weeks and $500-$1,500 in material premiums over domestic equivalents.
West Palm Beach homes built before 1985 – which covers a significant share of the housing stock in neighborhoods like Grandview Heights, Kenwood, and the historic districts near Flagler Drive – frequently have original cast-iron tubs. Cast iron weighs 200-350 lbs and requires a two-person removal, adding roughly $150-$300 in labor over a fiberglass tub pull. It’s a small line item, but it belongs in a written quote, not discovered on demo day.
Tub-to-Shower vs. Full Bathroom Remodel: When the Conversion Makes More Sense

A full bathroom remodel in West Palm Beach runs $9,000-$28,000. If the rest of the bathroom – vanity, floor tile, toilet, lighting – is in acceptable condition, a tub-to-shower conversion at $3,500-$10,000 is a targeted investment that changes the room’s daily usability without replacing things that don’t need replacing.
The math changes if the bathroom has other deferred maintenance. If the floor tile is cracking, the vanity top is delaminating, and the mirror is the original builder piece from 1988, bundling everything into a single remodel usually costs less per trade than doing each item separately over three years. Rowan quotes both scenarios in writing so the homeowner can compare them side by side before committing to either.
For context on related project costs: a new bathroom vanity installation in West Palm Beach runs $800-$3,000, and a walk-in shower installation (when starting from scratch rather than converting an existing tub space) runs $4,500-$12,000. A small bathroom remodel that addresses most surfaces runs $5,000-$12,000. All of these are quoted under the same flat-price, written-scope system – the number is on paper before anyone picks up a tool.
How to Save on Tub-to-Shower Conversion in West Palm Beach
There are practical ways to control cost on this project without cutting into quality. None of them involve skipping the waterproofing membrane or the permit – those are not optional, and any contractor who suggests otherwise is not someone you want doing wet work in your home.
- Keep the drain in its current location. Moving a drain even 6-12 inches requires opening the floor, adjusting the p-trap, and sometimes adding a clean-out. If your layout works with the drain where it is, designing the shower around that position saves $300-$600 in plumbing labor.
- Choose porcelain over natural stone. A quality 12×24 porcelain tile in a wood-look or concrete finish costs $3-$6 per square foot versus $10-$20 for marble or travertine. It’s also more practical in West Palm Beach’s hard-water environment – natural stone requires sealing and is more susceptible to moisture damage over time.
- Use a prefabricated shower pan rather than a custom mud-set base. An acrylic or composite shower pan – Kohler’s Choreograph system and American Standard’s MAAX series are both solid options – installs in a fraction of the time of a custom-tiled floor and costs $400-$700 less. The trade-off is that the design options are more limited, but the durability is comparable.
- Get a written scope before you commit to anything. Rowan’s free estimate at (561) 475-3903 produces a line-item written quote – not a range, not a verbal number. Bring a competitor’s quote and we’ll review it line by line at no charge under our Free Second Opinion offer. That review has saved West Palm Beach homeowners real money by identifying missing line items – waterproofing membrane charges left out to win the bid, for example – that show up as change orders mid-project with other contractors.
- Bundle with other bathroom work if the timing is right. If the vanity or floor tile also needs attention, scheduling it in the same mobilization cuts setup and cleanup time. The per-trade cost of each item doesn’t change, but you avoid paying for a crew to come back to an already-disrupted bathroom a second time.
- Avoid the high-demand window if your timeline is flexible. West Palm Beach renovation demand peaks from October through March, when seasonal residents are in town and every contractor is booked out. If your project can wait until April or May, scheduling flexibility often translates to faster crew availability – and faster projects cost less in overall labor hours.
What Rowan Construction Group Puts in Writing Before Work Starts

Under Clause 1 of the Haven Standard, a written price is delivered before any work starts, every time, without exception. That document includes the line-item scope (demo, waterproofing, tile, plumbing, fixtures, cleanup), the materials specified by brand and SKU where applicable, the permit responsibility, and the payment schedule. Nothing is vague by accident.
Every visit includes a documented photo record – substrate condition before waterproofing, membrane coverage before tile, rough-in plumbing before walls close. Those photos go to the homeowner. They’re not filed internally and forgotten; they’re the evidence that the work was done correctly, in the right sequence, with the right materials. In a market where you can’t see what’s behind the tile once the job is done, that documentation matters.
The 365-Day Done Right Promise means that if something isn’t right within a year of completion, Rowan makes it right. That’s not a handshake – it’s printed on the contract and backed by The Haven Standard’s terms, not an asterisk in small print.
Grant Rowan has been building under that standard since 2007, across 4,000-plus projects. The discipline of signed change orders – no work proceeds on a change until the change order is signed – is the reason West Palm Beach clients find their final invoices within a few percent of the number they agreed to at the start. It’s administrative, not glamorous. But it’s what keeps projects from ballooning.
FAQs – Tub-to-Shower Conversion Cost in West Palm Beach
How much does a tub-to-shower conversion cost in West Palm Beach, FL?
A tub-to-shower conversion in West Palm Beach costs $3,500-$10,000, with most projects settling between $5,000 and $7,500. The low end covers a basic alcove conversion with a prefab pan, ceramic tile, and a standard framed door. The high end reflects a larger footprint, custom-tiled mud-set floor, large-format porcelain walls, frameless glass, and plumbing work beyond a simple valve swap. Call (561) 475-3903 for a free written estimate – the number you get will be a flat price, not a range.
How long does a tub-to-shower conversion take in West Palm Beach?
Most tub-to-shower conversions in West Palm Beach take 3-5 business days from demo to final fixture installation. A basic swap with a prefab base and tile walls on a clean substrate can finish in 3 days. A larger walk-in conversion with custom tilework, a mud-set pan (which needs 48-72 hours to cure), and a permit inspection – required for plumbing work in Palm Beach County – typically runs 5-7 days. Rowan schedules the permit inspection in sequence so the project doesn’t sit waiting on an inspector after the walls are ready to close.
Is it cheaper to repair or replace a tub-to-shower conversion?
If the existing shower is leaking at the membrane or has grout failure across multiple walls, repair typically costs $800-$2,500 and often fails again within 2-3 years if the underlying waterproofing is compromised. A full conversion at $3,500-$10,000 with a properly installed Schluter or RedGard membrane should last 15-20 years with normal maintenance. In West Palm Beach’s humidity, we regularly find that “repairs” on older tub-surround tile work are masking substrate damage that needs to be addressed at the source anyway. A written inspection quote – free at (561) 475-3903 – will tell you which situation you’re actually in.
Do I need a permit for a tub-to-shower conversion in West Palm Beach?
Yes, in most cases. Palm Beach County requires a permit for any work that relocates or modifies plumbing – which a tub-to-shower conversion almost always does, even minimally. The permit fee runs $150-$400 depending on scope and is included in Rowan’s written quote, not added later. Rowan pulls and manages all permits as part of the project. Skipping the permit is a code violation that can complicate home sales and insurance claims – it’s not a cost worth cutting.
Can you add a shower where a tub was without major plumbing work?
Often yes. If the drain location is compatible with the new shower pan and the existing shutoffs are in serviceable condition, the plumbing scope can be limited to a valve replacement and a minor drain adjustment – keeping plumbing costs in the $450-$750 range. Where it gets more involved is when the drain needs to move more than a few inches (requires opening the floor), the supply lines are old galvanized pipe, or the project includes converting from a tub/shower combo valve to a dedicated thermostatic shower system. Rowan identifies all of this during the estimate visit and documents it in the written scope before any work starts.
What’s included in a tub-to-shower conversion at Rowan Construction Group?
The project scope covers tub removal and disposal, substrate inspection and repair, waterproofing membrane (Schluter Kerdi or RedGard depending on the application), shower pan or custom mud-set base, wall and floor tile, plumbing valve and drain work, shower enclosure or door, fixture installation (showerhead, valve trim, grab bars if specified), permit management, and a documented photo record at each stage. Every item is listed by name in the written quote. Nothing is “included at our discretion” – the scope is what the scope says it is.
Key Takeaways

- Tub-to-shower conversion in West Palm Beach costs $3,500-$10,000; most projects land at $5,000-$7,500.
- The biggest cost variables are tile selection, plumbing scope, shower enclosure style, and existing substrate condition.
- Palm Beach County requires a permit for plumbing work; Rowan manages permits as part of every project at no separate charge.
- West Palm Beach’s year-round humidity makes proper waterproofing membrane installation – Schluter Kerdi or RedGard – non-negotiable, not optional.
- Older homes in neighborhoods like El Cid, Grandview Heights, and Flamingo Park often have cast-iron tubs and older plumbing that needs evaluation before quoting – which is why the estimate visit includes an on-site inspection, not a phone number and a guess.
- Every Rowan project includes a written flat price before work starts, signed change orders for any scope changes, a documented photo record, and a 365-Day Done Right Promise.
- Bring a competitor’s quote and Rowan will review it line by line at no charge.
Ready to Get a Written Price?
Grant Rowan and the team at Rowan Construction Group West Palm Beach have delivered more than 4,000 projects since 2007, every one with a written price on paper before work started. For a tub-to-shower conversion in West Palm Beach, that means a line-item quote with brand-specific materials, a clear scope, and a number you can hold us to. The estimate is free, the price is flat, and the 365-Day Done Right Promise is in writing. Call (561) 475-3903 to schedule your estimate – or visit our home page to learn more about the full range of trades we cover across West Palm Beach.
Written by Grant Rowan, Owner at Rowan Construction Group West Palm Beach, serving West Palm Beach since 2007.
Pricing reflects the West Palm Beach market as of 2026. Rowan Construction Group West Palm Beach offers free estimates – call (561) 475-3903.
What Our Customers Say
"Good communication throughout. Weekly written update meant I never had to chase them."
- Nadine G."They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R.







Before
After
Before
After